HIGHLIGHTS

B&H performed analysis and design calculations for cold-formed steel framing on the Phase II Modernization project. The cold-formed steel framing was designed to support the exterior finishes that wrapped the south canopies and portions of exterior wall above and below the south canopies.

For the original design of the stadium, B&H performed the steel and concrete structural analysis and design for typical stairs, landing platforms, guard rails and hand rails throughout the stadium.